Survey, consult, and prepare the investment construction project for upgrade Tra Ly dyke system from K0-K42 in Thai Binh Province

Project Management Board – Department of Agriculture and Rural Development in Thai Binh

Thai Binh

Survey and prepare the project for revetment of Ta Lang river in the center of Azut and Bhalee commune cluster in Tay Giang District, Quang Nam Province

Project Management Board of Investment & Construction of Tay Giang District

Quang Nam

Survey, consult, and prepare the investment construction project for restore and upgrade Ma River at the left and right bank, segment from Hoang Long bridge to Cua Hoi in Thanh Hoa Province

Branch of Dyke Management and Flood Storm Control of Thanh Hoa Province

Thanh Hoa

Survey, consult, prepare the investment project; design the working drawing and establish the cost estimate for project: Upgrade the revetment protecting river bank from storm and flood in the right bank of Red River and in the left bank of Dao river in Nam Dinh Province.

Agriculture and Rural Development Project Management Board of Nam Dinh Province

Nam Đinh

Consult, survey and design the working drawing for the anti-erosion revetment of ĐăkBla river across PleiDon and Kon Ro Villages, Kon Tum Province 

Project Management Board of Basic Construction on important works, Kontum city 

Kon Tum

Bidding package No.1 includes: consult, survey, design the working drawing and establish cost estimate for the project: revetment protecting Gam river bank at the downstream of Tuyen Quang hydroelectric power station in Na Hang Town, Na Hang District, Tuyen Quang Province    

Investment & Construction Project Management Board of the work protecting Gam river bank at the downstream of Tuyen Quang hydroelectric power station in Na Hang town

Tuyen Quang

Consult, survey, prepare investment project for upgrading Van Uc Dyke from K0+00 to K24+800, Tien Lang District, Hai Phong Province.

Agriculture and Rural Development Project Management Board of Hai Phong Province

Hai Phong

Survey, prepare total investment, establish the cost estimate and design the working drawing for urgent anti-erosion work in the left bank of Red River in Ngoc Lam Ward, Long Bien District, Ha Noi City 

Project Management Board of anti-erosion work in Long Bien Ward, Long Bien District, Hanoi City

Ha Noi

Survey, technically design the working drawing and prepare the cost estimate for anti-erosion revetment of Na Ma, Na Ta and Na Ban field in the provincial road No.34 and protect the residential area 10, Bao Lac town 

Project Management Board of Investment & Construction of Cao Bang Department of Agriculture and Rural Development 

Cao Bang

Consult, survey and prepare the investment construction project for emergency treatment of An Binh revetment in Nam Sach District, Hai Duong Province

Agriculture and Rural Development Project Management Board of Hai Duong Province

Hai Duong

Consultation survey, design the working drawing and prepare the cost estimate for project: Restore, upgrade and urgently treat the important erosion places of Ma river’s right bank from K13+200 to K27+400 in Yen Đinh District, Thanh Hoa Province

Branch of Dyke Management and Flood Storm Control of Thanh Hoa Province

Thanh Hoa

Hot news
Internal news
 

Support
Tel : (043)733.9752-733.5705
Fax : (043)734.1101-733.8794
Email : cwrct@wrd.gov.vn
Back to top
eurowindow facebook
hiểu đúng về eurowindow
eurowindow tuyển dụng
eurowindow khai trương căn hộ