English (United States) Tiếng Việt (Việt Nam)
Search Search
Dyke, river revetment

No. Contract Name Contractor Province/City
A. DYKE, RIVER REVETMENT

 

 

1.       

Prepare project to construct revetment preventing Ben Tre river bank erosion, Ben Tre Town Department of Agriculture and Rural Development of Ben Tre

Ben Tre

2.       

Prepare basic investment construction project: Revetment preventing Tien river bank erosion, Hong Ngu town, Dong Thap province (Package 01 and 02) Department of Agriculture and Rural Development of Dong Thap

Dong Thap

3.       

Project of revetment preventing Tien river bank erosion, Hong Ngu Town, Dong Thap Province

Department of Agriculture and Rural Development of Dong Thap

Dong Thap

4.       

Survey, prepare basic investment construction project: Revetment preventing Long Binh and Co Chien rivers’ bank erosion (Phase III – Period II) Tra Vinh Town, Tra Vinh Province

Water Resources Project Management Board of Tra Vinh Province

Tra Vinh

5.       

Survey, Prepare Investment project: Revetment preventing O Mon River Bank erosion, O Mon district, Can Tho City

Department of Water Resources of Can Tho City

Can Tho

6.       

Investment and Construction Project: Revetment preventing river bank and protecting Thu Thua Town, Thu Thua District, Long An Province from  K0+100-K2+950 with the total length of 2941m

Department of Agriculture and Rural Development of Long An

Long An

7.       

Prepare Investment and Construction Project for flood prevention structures of the southern area of Dinh River.

Agriculture and Rural Development Project Management Board of Ninh Thuan

Ninh Thuan

8.       

Survey, prepare basic investment construction project from K0+000 to K1+689 (L=1.689m) of Project on improving dyke and revetment of the Han River mouth, from the South of Tuyen Son Bridge – Hoa Hai, Ngu Hanh Son District, Da Nang City

Department of Agriculture and Rural Development of Da Nang

Da Nang

9.       

Survey consultation, prepare report on technical design, and prepare basic investment construction project: Revetment protecting riverbank of A Vuong River, Administrative center of Tay Giang Province.

Agriculture and Rural Development Project Management Board of Quang Nam

Quang Nam

10.  

Review, Survey, prepare basic investment construction project: Dyke, revetment protecting the left river bank of Ban Thach river, from Nguyen Van Troi bridge to My Cang bridge, An Phu ward, Tam Ky town.

Agriculture and Rural Development Project Management Board of Quang Nam

Quang Nam

11.  

Survey, prepare basic investment construction project: revetment of Thu Bon riverbank, Hoi An area, Quang Nam province.

Agriculture and Rural Development Project Management Board of Quang Nam

Quang Nam

12.  

Survey consultation the period of technical implementation, TKBVTC and cost estimate the river revetment in the area of Quang An, Quang Phuoc of the project works against the Bo river erosion through the communes of Phong Son, Phong An, Huong Toan, Huong Phong, Quang Tho, Quang An and Quang Phuoc, Thua Thien Hue province.

Investment and Construction Board of Agriculture and Rural Development

Thua Thien Hue

13.  

Review, prepare project for Ta Lang river revetment in planning centers of Azut commune clusters, Bhalee commune, Tay Giang, Quang Nam.

Project Management Board of investment and construction of Tay Giang District

Quang Nam

14.  

Survey, plan project to construct revetment preventing DacPne river bank erosion, KonRay, Kon Tum

Project Management Board of Water Resources – DARD of Kon Tum Province

 Kon Tum

15.  

Survey, make report on Technical Implementation Project: Dike, revetment protecting the left side of Ban Thach river bank, from Nguyen Van Troi bridge to My Cang bridge, An Phu Ward, Tam Ky, Quang Nam Province

Agriculture and Rural Development Project Management Board of Quang Nam

Quang Nam

16.      

Survey, prepare construction Project to deal with important dyke part from K44,9-K48,6  of the right Chu river bank, Thieu Chau - Tan Thieu, Thieu Hoa district, Thanh Hoa province

Division of Dyke Management and Flood Storm Control of Thanh Hoa

Thanh Hoa

17.  

Surveys, plan project to construct Dyke and revetment protecting the right Can river bank from Thung Vang Mountain to the connection point with dikes, revetments in (Ninh Binh province), Nga Dien commune, Nga Son district, Thanh Hoa province

Division of Dyke Management and Flood Storm Control of  Thanh Hoa

Thanh Hoa

18.  

Technical Design - Sub-project on upgrading clusters revetment in Viet Tri cross-road, Phu Tho

Agriculture and Rural Development Project Management Board of Phu Tho

Phu Tho

19.  

Technical Design - Sub-project on upgrading clusters revetment in Cat Bi – Quang Lang, Phu Xuyen, Ha Tay province from ADB aids.

Project Management Board No. 401-MARD

Ha Tay

20.  

Technical Design - Sub-project on upgrading clusters revetment in Phuong Do – Cam Dinh, Phuc Tho, Ha Tay province from ADB aids

Project Management Board No. 401-MARD

Ha Tay

21.  

Survey, prepare basic investment construction Sub-project on upgrading clusters revetment in Duong river, Bac Ninh province.

Agriculture and Rural Development Project Management Board of Bac Ninh

Bac Ninh

22.  

Project on revetment erosion in Nam Hong, Tien Hai district, Thai Binh province

Project Management Board of Agriculture and Rural Development works in Thai Binh Province

Thai Binh

23.  

Survey, prepare projects on investment and construction: regular dyke upgrading in 2007, Hanoi - the Central source.

Project Management Board of concretization revetment of Red River banks

Ha Noi

24.  

Prompt deal with riverbank erosion in Hong Ha, Dan Phuong district, Ha Tay province.

Dyke Project Management Board of Ha Tay

Ha Tay

25.  

Survey, investment project, technical design Project: Revetment against erosion Cau riverbank in Khau Vang, Nguyen Thi Minh Khai ward, Bac Kan Town, Bac Kan province.

Agriculture and Rural Development Project Management Board of Bac Kan

Bac Kan

26.  

Survey and set up investment projects of structure construction, prepare basic investment construction project works: emergency treatment of the right bank of the Red River area in Chau Son commune, Ba Vi district, Ha Tay.

Chau Son Revetment Project Management Board

Ha Tay

27.  

Consultation survey, Survey, prepare basic investment construction sub-project: on upgrading revetment clusters in Phuong Do Cam Dinh, Phuc Tho district, Ha Tay province.

Project Management Board of upgrading revetment clusters in Phuong Do - Cam Dinh

Ha Tay

28.  

Survey, prepare investment project: Emergency treatment to prevent erosion of Dai Dinh Revetment Dai Dinh – Cao Dai, Cam Gia hamlet – An Trung commune, An Lao hamlet – Vinh Thinh commune, Vinh Tuong district, Vinh Phuc.

Division of Dyke Management and Flood Storm Control of Vinh Phuc

 

Vinh Phuc

29.  

Survey, prepare investment project: Revetment preventing river bank erosion of Muong Hum commune, Bat Xat district, Lao Cai

Project Management Board of Irrigation and Rural Water Supply of Lao Cai Province

Lao Cai

30.  

Survey, prepare basic investment construction project: Prevent bank erosion of Yen Dinh Commune, and center of Cho Moi, Cho Moi District, Bac Kan Province

Project Management Board of Basic Investment Construction of Cho Moi district

Bac Kan

31.  

Survey, prepare basic investment construction project: Revetment preventing river bank erosion of Bung Lao town, Muong Ang district, Dien Bien Province

Project Management Board of Investment & Infrastructure Construction of Bung Lap District

Dien Bien

32.  

Survey, prepare basic investment construction project:  Emergency treatment to prevent erosion of Dai Dinh Revetment – Cao Dai, Can Gia hamlet, An Trung commune and An Lao hamlet, Vinh Thinh commune, Vinh Tuong district, Vinh Phuc.

Division of Dyke Management and Flood Storm Control of Vinh Phuc

 

Vinh Phuc

33.  

Survey, prepare basic investment construction project: Emergency treatment to prevent erosion of Da River Banks (behind Khanh Thuong Revetment – Minh Quang) Ba Vi district, Ha Tay Province

Project Management Board of Khanh Thuong Revetment – Minh Quang

Ha Tay

34.  

Survey, prepare basic investment construction project: Emergency treatment to prevent erosion of Red River Bank, Thai Hoa area and Phong Van commune, Ba Vi District, Ha Tay Province

Project Management Board of emargency treatment of revetment in Thai Hoa – Phong Vân

Ha Tay

35.  

Survey, prepare supplementary project, prepare basic investment construction project of Thuy Van revetment – Cao Xa from K94-K96  on the left side of Thao River

Project Management Board of Agriculture and Ruraldevelopment Construction of Phu Tho

Phu Tho

36.  

Survey, prepare basic investment construction project: Emergency construction of residential resettlement on the right side of Red River, Hong Ha Commune, Dan Phuong District, Ha Tay

Project Management Board of residential resettlement of Hong Ha commune

Ha Tay

37.  

Survey, prepare basic investment construction for sub project: Revetment of Tra Ly River, Thai Binh Province

Project Management Board – Department of Agriculture and Rural Development of Thai Binh

Thai Binh

38.  

Survey, prepare basic investment construction project: Revetment preventing river bank erosion of Da River , Trung Minh – Dan Ha – Hop Thanh communes, Ky Son district, Hoa Binh Province

Project Management Board of Basic Construction on Agriculture and Rural Development of Hoa Binh

Hoa Binh

39.  

Survey, prepare basic investment construction project: Revetment preventing river bank erosion of Da River in Yen Mong commune, Hoa Binh city, Hoa Binh Province

Project Management Board of Basic Construction on Agriculture and Rural Development of Hoa Binh

Hoa Binh

40.  

Survey, prepare basic investment construction project for dyke and revetment in Trung Minh Commune, Ky Son District, Hoa Binh Province

Project Management Board of Basic Construction on Agriculture and Rural Development of Hoa Binh

Hoa Binh

41.  

Survey, prepare basic investment construction project for emergency dealing with erosion on the left side of Red River bank, Ninh So commune, Thuong Tin District

Project Management Board of emergency treatment of revetment in Ninh So

Ha Noi

42.  

Survey, design the working drawing for Phase 1 including: Hau Trung 2 revetment, Nhan Thanh Revetment and Tien Phong Revetment

Project Management Board – Department of Agriculture and Rural Development Thai Binh

Thai Binh

43.  

Survey, prepare basic investment construction project for revetment preventing erosion of Na Dong spring, Yen Minh Town, Yen Minh district, Ha Giang

Construction Investment Project Management Board of Yen Minh

Ha Giang

44.  

Survey, prepare basic investment construction project of Revetment protecting the riverbank in the Chinese-Vietnamese frontier, upstream of Luc Cau (Phase II) Quang Kim Revetment

Department of Agriculture and Rural Development Lao Cai

Lao Cai

45.  

Prepare project and technical design for Duong River (ADB3) Bac Ninh – Technical design phase

Project Management Board of agriculture and rural development works in Bac Ninh

Bac Ninh

46.  

Survey, prepare project and design for Nam Sach Dyke, Hai Duong

Basic Investment board of Water Resource -Ministry of Agriculture and Rural Development

Hai Du­ong

47.  

Technical design for emergency treatment for the right side of Hoang Long Dyke, Ninh Binh Province.

Project Management Board of Dam Cut Dyke Ninh Binh

Ninh Binh

48.  

Survey, prepare basic investment construction project of regular dyke reinforcement in 2006: Category of reinforce dyke surface of Huu Hong dyke, Phu Xuyen district, Ha Tay Province.

Project Management Board of dyke reinforcement, Ha Tay Province

Ha Tay

49.  

Survey, prepare investment construction project for dyke and revetment of Do Tam – Van Phai, Pho Yen district, Thai Nguyen.

Project Management Board of regular dyke reinforcement, Thai Nguyen

Thai Nguyen

50.  

Consult, prepare investment construction project for emergency treatment for dyke of Bac Giang province. Place: Reinforce the right side of Cau Doan dyke from K1+800 to K4+500, and from K25+300 to K27+00.

Project Management Board - Department of Agriculture and Rural Development Bac Giang

Bac Giang

51.  

Construction survey, prepare investment construction project for regular dyke reinforcement in 2007, Hanoi city. The project used the State Fund

Project Management Board of revetment for Red River

Ha Noi

52.  

Consult, prepare investment construction project: Reinforce and upgrade the Hoang Long Dyke, Gia Vien district, Ninh Binh. Category: Complete sectional drawing of Hoang Long Dyke from K3+500 to K12+700

Project Management Board of water resources infrastructure - Department of Agriculture and Rural Development Ninh Binh

Ninh Binh

53.  

Survey, consult, and prepare the investment construction project for upgrade the dyke surface in combination with traffic for Lien Tri encircling dyke. This dyke is protecting the industrial cluster of South Red River, Dan Phuong district, Ha Tay

Project Management Board of Lien Tri encircling dyke, Dan Phuong district

Ha Tay

54.  

Consult, design technical structure for Vinh Niem Dyke and Don Nghia reservoir for water discharge. This works were implemented with the purpose of supporting to the Project of solid waster management and water discharge of Hai Phong city, phase II

 NIPPON KOEI Company

Hai Phong

55.  

Prepare the investment project for dyke thoroughfare of Hanoi city

Project Management Board of Dyke management in Hanoi

Ha Noi

56.  

Survey, prepare the investment construction project for dyke surface reinforcement from K12+572,3 to K19+824,5, Hoai Duc district, Ha Tay province

Project Management Board of Investment Construction of Hoai Duc district

Ha Tay

57.  

Survey, prepare the investment construction project for dyke surface reinforcement from K137+500 to K169+500, Y Yen District, Nam Dinh province

Project Management Board of Investment Construction for concreted dyke surface, Y Yen District

Nam Dinh

58.  

Survey, prepare the investment construction project and estimation for the dyke structure and revetment of Trung Minh commune, Ky Son district, Hoa Binh province

Project Management Board of Basic Construction for Agriculture and Rural Development

Hoa Binh

Hot news
Internal news
 

Support
Tel : (043)733.9752-733.5705
Fax : (043)734.1101-733.8794
Email : cwrct@wrd.gov.vn
Back to top
eurowindow facebook
hiểu đúng về eurowindow
eurowindow tuyển dụng
eurowindow khai trương căn hộ